Deliverable D1

SI traceable S-parameters of a set of primary standards

Description: Report on SI traceable S-parameters of a set of primary standards including impedance measurements.

Partners: SIQ, CMI, NQIS, TUBITAK, METAS

Delivery date: May 2019


Deliverable D2

EURAMET project 1426: S-parameter measurement comparison conducted with the help of VNATools

Description: Report on the S-parameter comparison conducted with the help of VNA metrology software (VNA Tools II), including evidence of the submission of the report to EURAMET TC-EM for approval and publication.

Partners: METAS, CMI, INTA, SIQ, SP, GUM, NIS, NQIS, TUBITAK

Delivery date: May 2019

See also details of the inter-laboratory comparison at the EURAMET website (comparison registered as no. 1426).


Deliverable D3
 
Description: This deliverable summarizes outputs of the work package 2 in terms of best practice guides. There are three best practice guides in this work package: (i) calibration of power sensors for low-power measurement, (ii)  the measurement of high-power and (iii) low-power measurement using diode type power sensors in the presence of higher harmonics. All three Best practice guides are available in the Download section.
 
Partners: INTA, TUBITAK UME, CMI, NIS, EIM/NQIS, SIQ, GUM
 
Delivery date: May 2019

Deliverable D4
 
Description: 2 comparison reports on the (i) calibration of power sensors for low-power measurement and (ii) characterisation of the output VRC of microwave signal generators.
 
 
Partners: INTA, METAS, CMI, NQIS, NIS, SIQ, TUBITAK, GUM
 
Delivery date: May 2019

Deliverable D5 
 
 
Description: Report on support effects on EMC test results in both emission and immunity tests using a VNA.
 
Partners: TUBITAK, SIQ, SP, UPC
 
Delivery date: January 2018

Deliverable D6
 
Description: Improved EMC test and calibration methods which use the power of RF&MW and VNAs including (i) best method for the calibration of pulse generators, (ii) ‘just-before-test’ VNA verification method for EMC emissions conducted tests (iii) traceable loop antenna calibration methods using a VNA. All three Best practice guides are available in the Download section.
 
Partners: CMI, UPC, TÜBİTAK UME, RISE, SIQ, NQIS, UPC, INTA
 
Delivery date: May 2019

Deliverable D7
 
Description: Long-term strategy reports for each partner on the long-term operation of capacity developed in the project, including regulatory support, research collaborations, quality schemes and accreditation.
 
Partners: All partners
 
Delivery date: May 2019

Deliverable D8
 
Description: Strategy reports for each partner for offering calibration services in their own country and in neighbouring countries.
 
Partners: All partners
 
Delivery date: May 2019

Deliverable D9
 
Description: Evidence of contributions to or influence on new or improved international guides, recommendations and standards with a specific focus on the following committees: EURAMET TC-EM SC-RF&MW, Turkish Standards Institution - MTC 036 EMC national mirror group (Turkey), Czech office for standards - metrology and testing (Czech Republic), AEN/CTN 208 – Aenor Spanish Committee on Electromagnetic Compatibility (Spain), SIST/TC EMC (Slovenia), Svensk Elstandard - TK EMC (Sweden). Examples of early uptake of project outputs by end-users.
 
Partners: All partners
 
Delivery date: May 2019